Every NewVistas building is set out on one grid, a cube of 0.625 metres, and assembled from one small kit of standard parts fitted without cutting. The grid is not a matter of style. It is how the community finances its own build-out, so a design that leaves the grid breaks the financing every building depends on.

Why one grid

Because every building is assembled from the same small parts, priced by competing certified vendors, fitted without cutting, renewed a tile at a time and movable to another lot or community, each building is a standard asset whose cost, life and reuse are known before it is built. The title repository can therefore finance each building on its own collateral and its verified leases, a lender holding a lien only on the asset it finances, and the build-out proceeds building by building as leases support it.

No building has a developer, an investor or an equity owner, and none may have one. Equity in a building would give someone other than the community a claim on title and residual, and would end the system in which only the community holds title and only Enterprise Owners operate.

Two measures

The perch (16.5 feet) fixes the pattern of the land and proves every closure; the metre builds it, and everything bought, delivered and replaced is metric. The grid governs construction; the perch governs the pattern. Sixteen grids make 10 m, 40 make 25 m and 64 make 40 m, so a public building of 88 by 132 feet on the plat is built as 43 by 64 grids.

Element Grids Metric
Seat width 1 0.625 m
Office, half a chamber 4 2.5 m
Storey height 7 4.375 m
Court width, 24 seats across 27 16.875 m
Court length, 480 seats 48 30 m
Building, five occupied storeys 35 high 21.875 m
Building with its utility storey 42 high 26.25 m

Every building inside the square stands 42 grids, so none competes for prominence. Above its five occupied storeys each carries a utility storey of 7 grids holding its fuel cells, water recycling and purification, waste processing, heat exchange, cooling and data centre.

The kit

  • Tile. A half-inch plate of multi-layer fibre cement cut 24 inches square, about 17 lb, with four connector holes. It is floor, wall, ceiling and structure at once. It is sealed by silane impregnation, tested every seven years where it meets the weather, renewed on a 50-year cycle, and milled back into new tile when retired.
  • Column. A painted steel bar, 7 grids long, standing only inside the building behind the tile; deeper bars of the same half-inch thickness take heavier loads in a public building.
  • Frame. Where a span exceeds the kit, as over the public court, steel frames carry lattice beams on every grid line.
  • Connector. One friction connector in each hole ties two tiles to an angle through a single nut. The tile, not the bar, carries the building.

No tile or column weighs over 30 lb, so neither needs a crane. Every part except a public building’s frame girders fits a 45-foot container, and a logistics Business Enterprise lands each container at the gate in building sequence. There are no volumetric modules, pre-finished panels or single-job parts, and nothing is cut: placement error goes into the gap and the easement.

Building and renewing

  • Piles, never slabs. Every building stands on piles, one at every grid intersection, each driven until its torque proves the load. No slab or poured foundation is allowed, because buildings move.
  • One trade on site. Every part arrives numbered with its fasteners in place. The assembler is the only trade on site: no plumber, electrician, plasterer or mason, and no hammer, saw, weld or plaster. Each fastener is run to a programmed torque, recorded and checked by SI. A building takes about a month from clearing the site to moving in, and robots under human supervision take over more of the work as buildings repeat.
  • Always new. No building wears out or is replaced whole. Each part is replaced as it wears, with the rooms in use: pile, column and angles last 250 years or more; tile and facade about 50.
  • Materials for everywhere. Each part is specified for salt air, hard freeze, drought and standing water, and bought as a component, never as a brand.

The corner stair and egress

Each building has four stairs, one in each corner, from grade to roof, enclosed at two hours. Every step rises a quarter grid and goes half a grid, so two risers and a tread make exactly one grid. Each court of 480 seats empties and refills on a 45-minute cadence and clears in under two minutes; in an emergency the four stairs alone give more than the width required.

No collection of sun or wind

No solar panel or wind turbine stands anywhere in a community, its farmland or its hinterland, nor on any roof, for roofs are for plants and food. Natural gas in fuel cells is the bridge for 300 years from 2031, and the destination is fission or fusion at the scale of the building. See The Atom in the Building.

Still in development

A few parts are open objectives, each carried by a research Business Enterprise under Bureau 13 and standardized by Bureau 2: the roller partition within its 1.5-inch easement, the lifting basin platform, the room-side leaf of the unit at grade, and the adapted grid frame and water-court air system.