Data Hub
Every building carries its own on-site computing hardware — two liquid-cooled server racks and a coolant distribution unit, tucked into a 6-grid bay in the utility storey alongside water, fuel cell, cooling, and waste. Each rack measures 0.60 × 1.07 × 2.24 m and weighs 1.4–1.8 tonnes, but because that weight concentrates on a small footprint, the floor loading directly beneath it runs 2,100–3,900 kg/m² — one of the two heaviest point loads in the entire plant run.

This isn’t a standalone server room. Every building of the square, the public buildings included, carries a data centre in its utility storey, joined on the community’s own fibre into one distributed farm, not a central data centre (§3.17). It sits between the fuel cells and the absorption cooling, and its low-grade heat goes to the water court, hot water and space heating.
Power comes from the same fuel-cell plant running everything else in the building (see Energy & Power) — 300 kW to the building, 60 kW to the greenhouse, 160 kW to this bay, one shared budget with three destinations. Heat is the part that doesn’t fully resolve: only a fifth to two-fifths of the 160 kW leaves through the liquid-cooling loop as intended; the rest escapes as ordinary waste heat into the air, adding to what the building’s cooling system has to absorb.
Where the design has a real, acknowledged weak point
Ordinarily a building’s plant sits on its utility firm’s shared ten-building grid, which absorbs load swings. But wherever a plant runs islanded — with no grid behind it — a sudden load step in the data hall, or the loss of a hall entirely, can collapse the plant’s frequency faster than the fuel cells can respond; they follow load in minutes, not seconds. The Constitution’s answer is a rule: every building’s plant carries a grid-forming battery, with a battery at each riser and in every door and lift (§3.11). It wasn’t part of the original design and is now a separate procurement item specifically because of this gap.
Governed by Bureau 23.